Case Study Overview: Maximo Upgrade
Maximo 5 to 7 Upgrade Project: Major Utility
Aquitas Solutions was contacted by a major power generation utility
to upgrade its existing CMMS to the Maximo 7 Asset Management
Maintenance solution. Aquitas consultants used their cross-industry
experience to find solutions that fit within the client’s
hardware parameters to implement the new Maximo EAM solution
without loss of daily operations. Following the Maximo
upgrade,
training was provided to key team members. After the internal
team was up and running, Aquitas’ Maximo EAM consulting
team was available for support as the system was being fully
optimized.
Customer Situation
A major power generation and deliver assessed their current maintenance
processes and determined a need to upgrade their existing Maximo
5 system to the Maximo 7 Asset Management Maintenance system.
Aquitas Role
Aquitas performed an initial assessment of the company’s
current business requirements and the ability for Maximo 7 to
meet its goals. Company representatives and Aquitas personnel
discussed the technical and functional requirements necessary
for a successful implementation. A review of the current Maximo
5 environment assisted with a knowledge transfer for continuing
functionality in the 7 environment. Following the implementation
assessment, Aquitas performed a Maximo 7 upgrade installation
for the company. Aquitas was also responsible for the upgrade
of the existing 5 database to the 7 database version. Aquitas
then completed the data upgrade and migration of the company’s
current production data into Maximo.
Maximo Profile
Maximo
Version: Upgrade to Maximo 7.1.1.5
Database: SQL Server 2005
Application Server: IBM Websphere 6.1
Reports: BIRT Reporting
Project Challenges
The identification of a company’s business requirements
can be a significant effort. Once the original business requirements
are delineated, the implementation of the functionality frequently
leads to the discovery of new requirements. For example, one
requirement dictated the entry of the work order log before a
work order was allowed to be completed or closed. Simply making
the log file a required entry for a work order would have necessitated
a log file entry upon work order creation. The log entry is used
to document findings during work order executions hence, rendering
this process invalid. This discovery led to new requirements
and additional conditional expressions to further enhance Maximo
functionality.
The company’s limited hardware resources
also presented a unique challenge for the implementation. One
Production server
existed with the current Maximo 5 environment with an additional
5 database server. A Test server, containing both the application
and database, also existed and was reloaded with MS SQL 2005
and Maximo 7. Hands-on training was performed in the Test environment
and all current data was migrated to the Test database just
prior to the pre-determined Go Live date. While users operated
in the
Test environment, Aquitas performed the new installation of
Maximo 7 on the original Production server. Since the Production
environment
database was stored on a separate server, this allowed for
more resources to be available for daily operations. Upon completion
of the installation, the current Test data was migrated to
the
new Production database.
Actions Taken
Preparation
Implementation workshops were conducted between the client
and Aquitas consultants to review business and functional
requirements
and identify configurations and decisions necessary to set
up Maximo
EAM in support of the company’s specific needs.
Installation
and Configuration
Aquitas implemented several unique configurations based on
the company’s requirements, such as the development
of Conditional Expressions for controlling field security
and
the use of Escalations
to send notifications of records needing additional attention
from specific security groups.
Other customizations included
the implementation of Workflow for a purchasing management
process based on Security Group
Purchasing limits. The Workflow process will route the
individual Purchase
Requisitions and Purchase Orders to the appropriate group
for approvals or allow the option to cancel and redirect
the requests.
The company engaged Aquitas to design and develop 5 custom
BIRT reports to meet the business needs.
Finally, all configurations
underwent unit testing and completely met the design
needs stated by the business
requirements.
Data Migration and Integration
Aquitas worked with the company to determine what data
values from the company’s various legacy systems should be
migrated to the new Maximo 7 implementation. All identified
data was
validated and transferred through a Data Migration Mapping
process and
the development of Data Migration Scripts. This included
the migration of Assets, Locations, PMs, POs, PRs, WOs, and
Security.
A data migration and upgrade was performed with current 5
data to the 7 database on the Test server. Upon completion
of the
Production server installation, the most current Test server
data was then migrated to the Production database for a seamless
transition.
Training and Support
A week of direct hands-on training was provided to key
users in the company in the use of Maximo and its associated
components
using a Train-the-Trainer approach. The company requested
that training materials not be developed prior to the training
sessions.
These materials were developed by the company after the system
was operational.
Following Go-Live Operations, Aquitas remained on-hand to
provide immediate support during the stabilization and optimization
phase.
Results Achieved
The combined, dedicated efforts of members from Aquitas and
the client led to a successful Maximo 7 upgrade that was
on time
and on budget. Prior to Go-Live, the migration of legacy
data through the customized Data Migration Scripts gave users
ample
time for hands-on training. The combination of these results
deemed the Maximo EAM implementation a success.
Immediate
greater visibility of job costs in the maintenance department.
Immediate
greater visibility of material planning and purchasing
process, including stock on hand and special items.
Increased
interaction between technicians, schedulers, engineering,
and environmental personnel.
Single
repository for job planning and analysis of job processes
(i.e. job plan evaluations).
Ad-hoc
reporting for power users to create their own information
access.
Location
and Asset drilldown now providing an accurate view for
everyone into plant structure. This is just one example of how Aquitas Solutions’ Maximo
upgrade, implementation and training services can help your
organization. View our other Maximo
case studies or see how Aquitas Solutions
can tailor our Maximo
services to your specific industry.
|