Maximo Installation, Integration and Upgrade Case Studies
Aquitas Solutions believes in examining our projects and specific
work performance to continually benchmark against the methodology
utilized. By reflecting on our strategies and refining best practices,
we are able to tailor our approach in future projects to suit
the needs of new clients.
Additionally, we feel these case studies
can be valuable to other companies who may be seeking to engage
in similar efforts. Browse
our case studies below and contact us to discuss how we can
address your individual Maximo
support needs.
Our Maximo Case Studies
Maximo 7 New Implementation: Oil & Gas Refinery:
Aquitas provided
complete implementation services to a major oil refinery with
a need to transition its existing CMMS to the Maximo EAM 7.1 Oil & Gas
Industry Solution. Our oil and gas industry Maximo consultants led the
team through
the entire process, from the preparation stages through Maximo
installation, as well as the training and support that followed. We also
did a Maximo
integration with their ERP system and the overall project deemed
a success.
Download
this case study
Maximo 6 Implementation Project: Pharmaceutical
(Bio-Tech):Aquitas Solutions consultants
were hired by a major life sciences bio-tech company
to help implement Maximo with Calibration. The project utilized
a number of consulting companies and took place over a period
of several years.
This multi-site implementation solution replaced three legacy
systems and included the Syclo Mobile Work Management solution.
From the Maximo
integration of the Life Sciences Industry Solution to the hands-on
training that followed, the
Maximo implementation was a success.
Download
this case study
Maximo
5 to 7 Upgrade Project: Major Utility: A major power generation
and delivery organization contracted Aquitas Solutions to
upgrade its
existing Maximo 5.2 system to the Maximo 7.1 Asset Management
Maintenance solution. Aquitas developed a customized approach
that fit within the
client’s work and hardware parameters to implement the new Maximo
solution with no loss of daily operations. Once the Maximo
installation was complete, hands-on training was provided to key leaders
in the organization.
Following a week of intensive training, Aquitas’ Maximo consulting
team remained available for our utility industry partner to
provide support during the stabilization and optimization phase.
Download
this case study
|